Brazos River Erosion Control Project Presentation Available

Posted: July 23, 2018  |  1 min read

All Posts

LID 7 Brazos River Erosion Control Project

On June 29th, the LID 7 Board of Directors held a meeting at the offices of AECOM to go over details and status of the Brazos River Erosion Control project.

Included below are the slides from the presentation.  The slides are also permanently stored in this site's Public Documents page.

Erosion Control Project - Presentation