Posted: July 23, 2018 | 1 min read
On June 29th, the LID 7 Board of Directors held a meeting at the offices of AECOM to go over details and status of the Brazos River Erosion Control project.
Included below are the slides from the presentation. The slides are also permanently stored in this site's Public Documents page.