In the interest in keeping New Territory residents as informed as possible on the engineering projects within the District, Fort Bend County Levee Improvement District No. 7 (FBCLID 7) tasked their engineering consultant, LJA Engineering, Inc., to create this document for the public to review.

FBCLID 7 - Master Drainage Plan Update (519 MB)

As many residents know, for development to occur in an orderly and economic manner proper planning is essential. Created in November 5, 1984, the 2,239-acre Fort Bend County Levee Improvement District No. 7 (FBCLID 7) provides funding for constructing flood plain reclamation, flood protection, and outfall drainage necessary for orderly development within the District. The report linked above presents an overall updated analysis of the existing approximately 2,050 acres of development within the leveed area of the District, and a plan for drainage and flood protection improvements.